Wastewater Treatment System Installation & Maintenance

While we have a long history of making upgrades to existing systems and providing operation and maintenance services, REM-CON also provides installation of wastewater treatment systems. At our customers’ request, REM-CON has installed several types of systems for local design/build manufacturers. REM-CON can provide and install all treatment and flow monitoring equipment as well as water quality monitoring meters (i.e. pH, temp, D.O., etc.)

Some of our past projects are included below.

Projects

REM-CON installed an 11,200 GPD heavy metals removal and cyanide destruction treatment system for this electroplating process.
REM-CON installed a dissolved air flotation (DAF) wastewater treatment system consisting of two 8,500-gallon equalization tanks with air agitation and chemical injection for ph adjustment, a flocculent, and coagulant mixing tube set up, and a 40 gpm DAF unit.
REM-CON installed a skid-mounted treatment system consisting of an oil water separator, chemical treatment system, dissolved air floatation system, resin bed filter, and sludge press.
REM-CON installed a 6,000 GPD heavy metals removal treatment system for this vehicle wash process utilizing select existing components to reduce overall cost.
REM-CON designed and installed a pH buffering system to adjust this plant's final effluent to meet discharge permit limits.
REM-CON designed and installed two lift stations and pH control and polishing system for this Brewery's wastewater treatment system.
REM-CON installed a 40,000 gallon glass-lined Steel AST, associated piping, concrete pad, and secondary containment.