ADESA-Atlanta, LLC: Fairburn, GA - Wastewater Treatment System Design

REM-CON installed a 6,000 GPD heavy metals removal treatment system for this vehicle wash process utilizing select existing components to reduce overall cost.  The system consists of a 4,000-gallon equalization tank, two 500 gallon mixing tanks, and four 2,500 gallon treatment/settling tanks.

 

REM-CON completed a turn-key operation on this project which included the installation of all power distribution systems, process systems and controls, piping installation, mounting of equipment, installation of flow monitoring equipment, system startup, O&M manual, and daily operation.

 

REM-CON’s licensed wastewater operator provides the daily operations of the wastewater plant.

 