Skip to Main Content
 Menu
Close

Petrolem Bulk Storage Tank Management

REM-CON personnel has been responsible for managing over 200 UST-related projects from UST removals and preparation of Closure Reports to AST installations.

  • UST removal closure reporting
  • UST and AST cleaning/system upgrades
  • AST Installation
  • Installation of secondary containment systems
  • Release detection systems
  • Remediation systems

Some of our past projects are included below.

Projects

REM-CON was contracted to remove the 8,000-gallon gasoline UST at this facility located in Atlanta, GA.
REM-CON was contracted to build and operate a temporary Dual-Phase Extraction System to remove free product from the groundwater at this site.
REM-CON was contracted to build a "pilot-scale" soil vapor extraction (SVE_/air sparge (AS) remediation system.