Sanitary Sewer Installation & Modifications

Projects

REM-CON was contracted to provide all site development activities which included site grading, installation of the retaining walls, concrete dumpster pad, all associated stormwater and sanitary piping, firemain, and all potable water lines prior to the construction of this multi-level apartment complex.
REM-CON acted as general contractor for the construction of our 6,000 sq. ft. office building completed in 2005.
REM-CON installed a 40,000 gallon glass-lined Steel AST, associated piping, concrete pad, and secondary containment.
The site was a former scrap yard located on 1.1 acres near the offices of EPD in downtown Atlanta. The objective of the site remediation was to remove all soils exhibiting the hazardous characteristic for lead, placement of a protective cover (Cap) to control any future migration of the residual soil contamination, and the installation of an asphalt parking lot.
REM-CON installed a 5,000-gallon oil/water separator, separated the sanitary and storm sewer systems, installed a backflow preventer, and modified the truck wash down area to treat the stormwater run-off from the facility.