Quick Stop Citgo: Atlanta, GA - UST Removal and Closure Reporting
REM-CON was contracted to remove the 8,000-gallon gasoline UST at this facility located in Atlanta, GA. The scope of work included the removal of the tank, excavation of contaminated soils, and preparation of a Closure Report. REM-CON also assisted in the placement of the new replacement UST and backfill.