Mondelez (formerly Kraft-Nabisco) Atlanta Bakery: Atlanta, GA Wastewater Service
REM-CON conducted daily inspections on the operation of the associated wastewater treatment system from 1999 to 2021. REM-CON also conducted the calibration on the ISCO flow meter on a semiannual basis and conducted the quarterly stormwater discharge inspections for this Facility’s Storm Water Pollution Prevention Plan. REM-CON transported the associated sludge generated from this plant during the same timeframe for disposal.
REM-CON completed the plant’s wastewater treatment system decommissioning in 2021.
Reference: Closed