Rem-Con
office (770) 271-4628
Remediation Construction

Standard Transport, Atlanta, Georgia Dual-Phase Extraction System

no image
REM-CON was contracted to build and operate a temporary Dual-Phase Extraction System to remove free product from the groundwater at this site. The system is capable of 200 CFM, can be connected to multiple extraction wells, and removes volatiles in the free phase, vapor, and dissolved form.