REM-CON demolished and disposed of the existing structures, rerouted the storm water system and a ten inch sanitary sewer main.

REM-CON Installed approximately 100 feet of 60 inch reinforced concrete pipe and 300 feet of 30 inch reinforced concrete pipe as part of the storm water system reroute. REM-CON was required to blast approximately 100 tons of bed to facilitate the installation of both the storm water and sanitary sewer systems.

Upon completion of the site work, REM-CON installed approximately 5000 square feet of flatwork concrete for the two new houses.