Rem-Con
office (770) 271-4628
Remediation Construction

Cohran Ventures, Cedartown, Georgia

no image

REM-CON conducted multiple Dual-Phase Extraction Events to remove free product from the groundwater associated with this UST Site.  Off-gas was treated through carbon filtration and extracted groundwater was disposed of through a local treatment facility.  Following free product remediation, activated sodium persulfate was injected by REM-CON into the groundwater to meet the cleanup standards.  Site was granted "No Further Action Required" status by EPD following injection.