Rem-Con
office (770) 271-4628
Remediation Construction

Boulevard Chevron Site, Atlanta, GA

no image
REM-CON fabricated, installed, and  operated an AS/SVE groundwater treatment system consisting of a trailer-mounted 10 HP electric 36J URAI (Roots) positive displacement blower, liquid gas separator, 5 HP Rietschle Model DLR 100 rotary claw compressor, liquid transfer pump, controls, and condensate storage tank.  SVE system capable of 200 CFM at 15-inches of Hg and AS system produced 65 CFM @ 10- PSIG. 

In addition, ISCO injections were completed by REM-CON to reduce the source levels of the petroleum contamination. 

Work completed in 2017/2018.